The June electricity bill showed £252.72 (7.5% of the bill) in charges the cost model didn't account for: Nuclear RAB Levy, Metering Charge, and DUoS Availability/Excess/Reactive. RAB levy and metering charge are modeled directly (same shape as CCL / standing charge); the DUoS charges need kVA capacity and kVArh reactive energy that only the supplier's own meter reads, so they're covered by one adjustable "other network charges" £/month field to update manually from each bill. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| public/icons | ||
| src | ||
| Dockerfile | ||
| index.html | ||
| nginx.conf | ||
| package-lock.json | ||
| package.json | ||
| tsconfig.json | ||
| vite.config.ts | ||