67dd943cdb Convert gas meter volume readings to kWh for cost calculations
Gas meters are read in raw volume (ft3 on our imperial meter, m3 on
newer metric ones), never kWh — but tariff rates and CCL/RAB levy are
all p/kWh. Add gas_volume_unit + gas_calorific_value to meters, and
convert reading deltas to kWh in cost-calc.js using the standard
UK gas-billing formula (matches the exact calculation printed on
supplier invoices) before any cost math runs.

Also fixes meter/readings pages showing raw gas dial readings
mislabeled as "kWh" — they now show the actual physical unit
(ft³/m³) via a new reading_unit_label, while computed consumption
stays correctly labeled kWh.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-28 13:25:03 +00:00
3b261a4d8d Add Nuclear RAB levy, metering charge and DUoS catch-all to tariff cost model
The June electricity bill showed £252.72 (7.5% of the bill) in charges the
cost model didn't account for: Nuclear RAB Levy, Metering Charge, and DUoS
Availability/Excess/Reactive. RAB levy and metering charge are modeled
directly (same shape as CCL / standing charge); the DUoS charges need kVA
capacity and kVArh reactive energy that only the supplier's own meter reads,
so they're covered by one adjustable "other network charges" £/month field
to update manually from each bill.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-28 13:07:20 +00:00
f1ce0f06d8 Fix TOU rate-window mismatch and enforce fallback-split validation
Rate windows were matched by substring (label.includes(key)), so
overlapping labels like "Day"/"Weekday" could silently cross-match to
the wrong rate. Switched to an exact match.

The "split must total 100%" check was advisory-only in the UI and
never validated server-side, letting a tariff save with a split that
doesn't sum to 100% and permanently mis-cost that meter's usage.
Enforced on both the API (POST/PATCH /api/tariffs) and the Save
button.

Also aligned the app's portal category to 'Hotel' (already correct in
auth/src/db.js) here and in stack-init/install-stack.sh, which had
both drifted to 'Operations'.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-28 12:59:19 +00:00
7ab048931f Split cost/estimate across mid-period tariff changes
Rate changes are often scheduled ahead of time or confirmed by finance
after the fact and backdated — assign-tariff already supported any
effective_from date, but cost-calc previously priced a whole period at
a single tariff (whichever was in force on the period-end date),
silently mispricing the days on the other side of a change.

getTariffSegments() finds every tariff assignment overlapping a date
range; getMeterCostForPeriod/getMeterEstimateForPeriod now split
consumption pro-rata by day count across segments and price each
against its own tariff, summing to the period total. Estimates project
the remaining days across a future-scheduled change the same way,
rather than assuming today's tariff holds for the rest of the period.

Also consolidates internal.js's cost/estimate routes (previously their
own duplicate calc) onto the same shared functions reports.js and
estimates.js use, so the Directors' report can't drift from the in-app
numbers.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-26 17:43:45 +00:00
4fc5230d79 Initial commit — utilities app (meter readings, tariffs, cost tracking)
Fastify + pg backend, React/TS/Vite frontend. Categories (electric,
gas, oil, water), meters with sub-metering rollup, tariffs with
time-of-use rate windows, standing charges, Climate Change Levy and
VAT, manual reading entry, consumption/cost reports, period cost
estimates, and an API-key-gated /api/internal/* surface for the
reports app's Directors Report.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>